Advantage/Notice
- All working steps can be carried out on one day
 - Due to the integrated check valve no injection material may run back through the packer
 - The thrust piece can be removed directly after the injection
 - The borehole can be sealed with appropriate material
 - The sealing system keeps the clamping rubber tensioned
 - Opening pressure approx. 10 - 15 bar
 
Material to be used
- 1C injection resin
 - epoxy resin
 - polyurethane
 - quick-foaming polyurethane
 - 2C injection resin
 - 2C polyurethane
 
Accessories
2 Variants
            9 Variants
            10 Variants